Bin-el-Ouidane - Ait Aadel 07/09/69
Hot 2904928914
135 miles
Mo and Chris up at 6 am to film the dam at dawn. I got up at 08:15 watched by the locals. Filmed our breakfast and then surveyed the dam.Could not get inside to see the turbines but Mo chatted to two technicians in the pub. Met a party of Safari people. Main dam had head of 100 metres and dam height of 105 metres.
3 Francis Alstron (France) turbines 45 MW each.Lake capacity 1.5 x !0^9 cubic metres, lake area = 3600 k^2, flow rate per turbine = 56 m^3/sec.
Alstron France 1946-1953.
Dam was completed in 1953.
2nd dam supplies head of 228m for powerhouse at Afourer - 8 Francis turbines each 56 MW, flow rate = 24m^3/sec. Also 2 Kaplan turbines for local power requirements at the dam itself and in the surrounding valley.
Water is then used to irrigate the nearby plain - orange grooves and maize fields-
in large water channels. The scheme is still being extended.
Bought food at El-Kelaa-des-Srarhna in the market place.Very busy despite being Sunday. Supper of stew and potatoes and grapes.Camped in valley near to
Ait Aadel dam.
The first photo taken from high up is one of my most memorable